Select Page

here are some selected handmade creations to give you a taste of what are we capable of building for our exquisite clientele

Materials: Wood, Veneer, Matt Finish Inside, Matt Clear Lacquer, LED White stripes everywhere (in all places in/out)

Fabrication Time: 20 Weeks

Cost: $$

Materials: Wood, Veneer, Gloss/Matt Finish Inside, Gloss White Lacquer RAL 9010, LED White stripes everywhere (in all places in/out)

Fabrication Time: 30 Weeks

Cost: $$

Materials: Wood Old Oak, Matt Finish, Greek Marble Counter Top (socketed), LED White stripes everywhere (in all places in/out)

Fabrication Time: 34 Weeks

Cost: $$$

Materials: Wood Negative Curved Skeleton, Matt Finish, Greek Marble Counter Top (socketed), LED White stripes everywhere (in all places in/out)

Fabrication Time: 32 Weeks

Cost: $$$

Materials: Wood, Veneer, Matt Finish Inside, Gloss Lacquer, LED White stripes everywhere (in all places in/out)

Fabrication Time: 28 Weeks

Cost: $$

Materials: Wood, Veneer, Gloss Finish Inside, Gloss Lacquer, Stainless Steel base element, The architect’s concept was ”180 degrees of asymetrical fluidity”, LED White stripes incerted horizontally in 2 levels

Fabrication Time: 21 Weeks

Cost: $$

Materials: Wood, Veneer, Gloss Finish Inside, Gloss Lacquer, Recessed base element, The architect’s concept was ”Trapezium upside down”, LED White stripes incerted in X’s and Z’s form in 4 levels

Fabrication Time: 27 Weeks

Cost: $$

Materials: Wood, Veneer, Gloss Finish Inside, Gloss Lacquer, Recessed base element, The architect’s concept was ”Trapezium upside down”, LED White stripes incerted everywhere

Fabrication Time: 22 Weeks

Cost: $$

Materials: Massive Wood Old Oak, Matt Finish, Oak Top, LED White stripes 1 row

Fabrication Time: 20 Weeks

Cost: $$$

Materials: Wood Old Oak, Matt Finish, Oak Top, LED White stripes 2 rows

Fabrication Time: 20 Weeks

Cost: $$

Materials: Combination of Italian Marble, Massive Oak (lightly smoked), Matt Finish, Italian Marble Top and lower piece, No LED’s lights and besides heavy hand craftsmanship, Marble CNC Machines where also commissioned, a very difficult curve and mount combination with two completely diverse recalcitrant materials. A Robust piece of 1550 Kgs altogether!

Fabrication Time: 40 Weeks

Cost: $$$$

Materials: Massive Wood Old Oak, Matt Finish, Marble Slab from Kavala for Counter Top, Hand sculpted, Hand sanded, Hand finished on the edges (at the surface rim lines) to look simultaneously sharp and acute

Fabrication Time: 30 Weeks

Cost: $$$